The testing process

Traditional CMMI or Waterfall development model

A common practice of software testing is that testing is performed by an independent group of testers after the functionality is developed, before it is shipped to the customer. This practice often results in the testing phase being used as a project buffer to compensate for project delays, thereby compromising the time devoted to testing.

A software Development Life Cycle (SDLC)

  • Requirement analysis: Testing should begin in the requirements phase of the software development life cycle. During the design phase, testers work with developers in determining what aspects of a design are testable and with what parameters those tests work.
  • Test planning: Test strategy, test plan, test bed creation. Since many activities will be carried out during testing, a plan is needed.
  • Test development: Test procedures, test scenarios, test cases, test datasets, test scripts to use in testing software.
  • Test execution: Testers execute the software based on the plans and test documents then report any errors found to the development team.
  • Test reporting: Once testing is completed, testers generate metrics and make final reports on their test effort and whether or not the software tested is ready for release.
  • Test result analysis: Or Defect Analysis, is done by the development team usually along with the client, in order to decide what defects should be treated, fixed, rejected (i.e. found software working properly) or deferred to be dealt with later.
  • Defect Retesting: Once a defect has been dealt with by the development team, it is retested by the testing team. AKA Resolution testing.
  • Regression testing: It is common to have a small test program built of a subset of tests, for each integration of new, modified, or fixed software, in order to ensure that the latest delivery has not ruined anything, and that the software product as a whole is still working correctly.
  • Test Closure: Once the test meets the exit criteria, the activities such as capturing the key outputs, lessons learned, results, logs, documents related to the project are archived and used as a reference for future projects.

Testing artifacts

Software testing process can produce several artifacts.

Test plan: Test Plan consists of scope, approach, objectives, risk analysis, test design, roles and responsibilities, resources and environment.

Traceability matrix: It is a document which trace out the link between the test plan and test cases i.e. by showing the no. of test cases prepared, executed, Passed and failed etc.

Test caseĀ :A test case normally consists of a unique identifier, requirement references from a design specification, preconditions, events, a series of steps (also known as actions) to follow, input, output, expected result, and actual result. .

Test script: The test script is the combination of a test case, test procedure, and test data.

Test suite: The most common term for a collection of test cases is a test suite. The test suite often also contains more detailed instructions or goals for each collection of test cases.

Test data: In most cases, multiple sets of values or data are used to test the same functionality of a particular feature. All the test values and changeable environmental components are collected in separate files and stored as test data. It is also useful to provide this data to the client and with the product or a project.